CIT CAMPUS
- Isolation of boilers and demolition of hot water heating systems
- Total of 9 Floors of Office space across two existing buildings
- Supply and installation of Hitachi Heat recovery VRF air conditioning, supply air and extract air ventilation including sever and lab rooms pressurisation
- Seismic installation
- Electrical for mechanical by Fantail including low level BMS controls
- 9-month project for Fantail
- At the time this was Hitachi’s 2nd largest VRF project in Wellington – 460 kilowatts of total cooling